December 8, 2016
BridgeFab have been contracted to supply, fabricate, surface treat and install structural steel for the St Peter and Paul’s GLA building. Located in Alexandra St, Bulimba.
Total weight – 7.20 tons
Projected start date – 18/11/2016
Structural Engineer – Cozens Regan Group
Architect – Bertoldi
Builder – James Trowse Constructions