BridgeFab have been contracted to supply, fabricate, surface treat and install structural steel for the St Peter and Paul’s GLA building. Located in Alexandra St, Bulimba.

Total weight – 7.20 tons

Projected start date – 18/11/2016

Structural Engineer – Cozens Regan Group

Architect – Bertoldi

Builder – James Trowse Constructions