“The work for the substation involved bored piers, cast insitu and precast concrete together with structural steel. The building also includes detailed metalwork, concrete beam and penetration arrangements required to accommodate Energex equipment and associated cabling. The construction involved complex buildability challenges such as restricted site access, and works around live cables and equipment.”